Concluído / Completed

Maintenance of the floodgates. Repair of turbine wheels. Renewal of the Refrigeration System of the Groups. Renewal of the Turbine Pit Drainage System.


  • Date:25-05-2019 08:00 - 28-06-2019 18:00
  • Location Valeira Dam (Map)